Term Meaning
Commissioning Proving that an installed system works as designed and recording the results
Pre-commissioning Checks done before the first start-up, with the compressor off
Interlock A condition that must be met before the next step is allowed
Anti-short-cycle timer Minimum compressor off time, typically 3 minutes
Set point Target temperature the controller works towards
Differential (hysteresis) Temperature band between switch-off and restart
Short cycling Frequent compressor starts and stops
P&ID Piping and instrumentation diagram, using standard symbols and tags
TT / PT / FT Temperature, pressure and flow transmitter (ISA tags)
JQ Power/energy meter tag (power totaliser)
Heating capacity (Q) Heat delivered to the water, in kW
Specific heat (cp) Energy to raise 1 kg by 1 K; water ≈ 4.18 kJ/kg·K
ΔT Temperature difference, here outlet minus inlet water
COP Coefficient of performance: heat out ÷ electricity in
Steady state Running condition where readings no longer change
Saturation temperature Boiling or condensing temperature at a given pressure
Superheat Suction line temperature minus evaporating saturation temperature
Subcooling Condensing saturation temperature minus liquid line temperature
P-h diagram Chart of refrigerant pressure against enthalpy
Enthalpy Heat content of refrigerant per kg, kJ/kg
Gauge vs absolute pressure Absolute = gauge + about 1 bar (atmospheric)
Insulation resistance Resistance between motor windings and earth; typical minimum 1 MΩ
True-RMS power meter Meter that measures real power in kW, accounting for power factor
Performance test report Factory record of a unit's tested capacity, power and COP
Handover Formal transfer of the system and documents to the owner
Defrost Cycle that melts frost from the outdoor coil