Chat with Sunniva on WhatsApp
Skip to Content
Industrial process heat

Process heat to 120 °C, without burning fuel

Most factory heat is needed well below 120 °C: washing, pasteurising, dyeing, plating, cleaning and drying. That heat usually comes from a diesel, gas, coal or briquette boiler. High-temperature heat pumps take it from ambient air or from your own waste heat instead, at three to four units of heat per unit of electricity at moderate lifts.

2012Building heat pumps since
5,000+Installations across India
Up to 120 °CProcess water and air
103Industrial application notes
Typical duties

Process duties a heat pump can take over

The lower the temperature lift, the higher the efficiency. Duties up to about 90 °C are routine; 95–120 °C works best with a waste-heat source.

DutyTemperatureWhat a heat pump does
Washing, CIP and degreasing50–85 °CHot water for cleaning lines, tanks and parts, replacing boiler steam.
Pasteurising and food processing60–95 °CDairy, juice, beverage and ready-to-eat lines.
Dyeing and textile pre-treatment60–120 °CDye baths and scouring, often with heat recovered from effluent.
Electroplating and surface treatment40–95 °CPlating baths, phosphating and anodising seal tanks.
Drying40–120 °C airClosed-cycle heat pump dryers for food, spices, chemicals and timber.
Boiler feedwater preheating80–90 °CHeat pump preheats; the boiler adds only the last step.
Waste heat recovery55–120 °CHeat from compressors, chillers, cooling towers and effluent lifted to process temperatures.
Worked example

Process water at 60 °C replacing a diesel boiler

A plant heating 20,000 litres a day from 30 to 60 °C for washing and process use, 330 days a year, about 698 kWh of heat a day.

₹24.4 lakhDiesel boiler, per year (85% efficient, ₹90/L)
₹5.9 lakhHeat pump, per year (COP 3.5, ₹9/kWh)
₹18.5 lakhSaving per year

Against PNG the saving is smaller, and against cheap briquettes the case rests on cleaner operation rather than fuel cost. Our heat pump vs boiler guide works through all five options, payback and the cases where a boiler is still the right choice.

Example only: process temperatures, running hours, tariffs and fuel prices change the result. Use the industrial calculator or send us your duty.
Why Sunniva

Engineering, not just equipment

Real industrial installations

Read how heat pumps were integrated at a multinational consumer-goods plant and a polymer plant.

MSME energy-efficiency support

We work with MSMEs on energy-efficiency programmes; see ADEETIE and Sunniva.

Process integration

We look at where the heat goes and where it is wasted, and often pair heating with cooling or heat recovery.

Made in our own factory

Designed and built in Asangaon, Maharashtra, so custom temperatures and configurations are possible.

Honest numbers

Capacity and COP come from our published datasheets; where a duty is outside them, we say so and estimate openly.

Service across India

A nationwide service network, spares from our own factory, and remote support by video call.

Questions we hear

Before you decide

How hot can an industrial heat pump go?

Our high-temperature range delivers 80 °C from ambient air, the super-high-temperature range 95 °C, and the ultra-high-temperature range 120 °C using a waste-heat source plus ambient air. Steam above that is a specialist duty.

Is it worth it if we burn briquettes or coal?

On fuel cost alone, often not, because solid fuel is cheap. The case rests on removing fuel handling, ash, emissions and labour, or on heat recovery where the heat pump also provides cooling.

Can a heat pump work alongside our boiler?

Yes, and that is often the best first step. The heat pump preheats feedwater or process water, and the boiler tops up only when needed and stays as standby.

We have waste heat. Can a heat pump use it?

Yes. Warm water from chillers, cooling towers, compressors or effluent is an excellent source, and a water-source heat pump lifts it to process temperature at a higher efficiency than air-source.

What do you need for a proposal?

The process temperatures, flow or daily volume, running hours, current fuel and its cost, and any waste heat available. Photos of the plant room help.

Send us your process duty

Temperatures, flows or daily volume, running hours and current fuel. An engineer will come back with a selection, an integration sketch and an honest payback.

Example figures use stated assumptions and example tariffs; your site’s numbers will differ. Model selection and capacities are taken from our published datasheets; confirm the final selection with our engineers.