Dairy and food processing

Dairy CIP hot water from heat pumps

How a 1.5 lakh litre-per-day dairy can heat all of its CIP lye, acid and rinse water with heat pumps, against a furnace-oil fired boiler.

Application#3 Dairy CIP (cleaning-in-place)
Temperature band60–85 °C
Sunniva selection5 × SE-SHT-25C
Replacesfurnace-oil fired steam boiler

▶Video: Process hot water for food, dairy and beverages

V02 · 2–2.5 min
Process hot water for food, dairy and beverages

Pasteurisers, CIP, cooking and washing on stored hot water instead of boiler steam

Video coming soon

01Problem statement

  • CIP runs round the clock. With many circuits in a large dairy, CIP is the one hot-water load that runs on all three shifts, so the boiler cannot be shut down at night.
  • Steam injection dilutes and overheats. Direct steam into lye and acid tanks dilutes the solution and creates hot spots. Concentration then has to be topped up with more chemical.
  • Temperature drift hurts cleaning. Lye below 75 °C or acid below 65 °C does not clean properly. Cycles get extended or repeated, which wastes water, chemicals and time.
  • Losses between fuel and process. Burning furnace oil in a boiler or heater and distributing the heat loses a quarter or more of the fuel's energy before it reaches the process.
  • Compliance, safety and handling. Fired equipment brings boiler inspections, fuel storage and unloading, flue emissions and an attendant on every shift.

02Use case

The reference dairy receives 1.5 lakh litres of milk a day by tanker. A central CIP station with recovery tanks cleans silos, pasteurisers, fillers and process lines, running about eight cycles a day. A separate CIP set cleans around 12 milk tankers a day at the reception bay.

Heat userProcess temp.BasisHeat, kWh/day
Lye (1.5% NaOH) reheat80 °C8 cycles × 3,000 L, recovered at 65 → 80 °C, 10% losses460
Acid (0.8% HNO₃) reheat70 °C8 cycles × 2,500 L, recovered at 55 → 70 °C, 10% losses383
Hot water sanitising rinse85 °C8 cycles × 1,500 L, 30 → 85 °C766
Tanker CIP bay75 °C12 tankers × 1,000 L, 30 → 75 °C627
Storage and pipework standing losses–about 5%112
Total useful heat2,348

Averaged over 20 running hours, the heat pumps need about 117 kW.

03P&ID

L-101 · Hot primary · 90 °CTT103L-102 · Return · ~68 °CY-STRP-101AP-101Bduty / standbyEXP-101FS101HP-101SE-SHT-25C · 25 kWHP-102…105SE-SHT-25C · 25 kWAir-source, outdoorTK-1014,000 L90 °CinsulatedventTT101TT102LT101softenermake-up waterVFDP-102A/BL-201 · Supply header · 88 °CTCV-201TIC201PHE-201Lye heater80 °Clye return 65 °Clye supply 80 °CTCV-202TIC202PHE-202Acid heater70 °CTCV-203TIC203PHE-203Rinse & tanker CIP85 °CL-202 · Return header · ~68 °CNCB-001 existing FO boilerstandby / top-up onlyhot supplyreturnsignalpumpvalvenormally closedINDICATIVE P&ID · NOT FOR CONSTRUCTIONAN-003 · Rev 0 · Sunniva Encon LLP

Tags: HP heat pump, TK tank, SG steam generator, P pump, PHE plate heat exchanger, TCV temperature control valve, TIC temperature indicating controller (panel), TT temperature transmitter, MT moisture transmitter, PT pressure transmitter, LT level transmitter, FS flow switch, NC normally closed. Process fluids are heated through their own exchanger, coil or jacket.

04Solution

System description

  • 5 × SE-SHT-25C (125 kW total) (SE-SHT cascade heat pump) delivering 90 °C, covering the day's 2,348 kWh in about 18.8 running hours.
  • A 4,000 L insulated storage tank decouples the heat pumps from the process peaks.
  • The furnace-oil fired steam boiler stays connected behind a normally closed valve as standby.
  • Lye and acid are heated through their own plate heat exchangers in the CIP supply line. No steam enters the solution, so concentration stays where it is set.
  • The recovery tanks return solution at 55–65 °C, so most of the CIP heat is a small top-up that suits heat pumps well.
  • Stored hot water covers peak demand when several circuits start together after a production change-over.
  • The tanker bay takes hot water from the same loop, so a separate boiler line to reception is not needed.

Selected equipment

ModelSE-SHT-25C × 5
Heating capacity25 kW each, 125 kW total
COP2.6 at A20 °C / W90 °C (data sheet T1)
Power inputabout 46.5 kW total at rated conditions
Ratingcascade R410A + R515B, rated 90 °C, 95 °C maximum
Supply temperature90 °C
Storage4,000 L insulated tank

Ratings from the Sunniva TDS 2026 data sheets.

Control philosophy

TT-101 at the tank top starts the heat pumps below 85 °C and stops them at 90 °C, staging units in turn. TIC-201 and TIC-202 hold lye at 80 °C and acid at 70 °C on the CIP supply. TT-102 at the tank bottom gives an early start when the CIP PLC signals a cycle. If the tank top falls below 78 °C, the existing steam heater is enabled as standby.

05Energy saving and ROI

Change any input to match a customer's site. Defaults are typical Indian prices for October 2026. The installed cost is a placeholder; replace it with the actual quotation.

Plant
Existing heating
Heat pump
Annual saving–energy + O&M
Simple payback––
Purchased energy––
10-year net gain–after paying for the system
ExistingHeat pump
Daily consumption––
Annual energy cost––
Cost per 1,000 L milk––
CO₂ per year––
Cumulative cash position, years 0–10

06Benefits

Stable CIP temperatures

Each circuit gets lye and acid at its set temperature, so cycles finish first time.

Less chemical top-up

No condensate dilution, so caustic and acid concentration hold steadier between top-ups.

Boiler off at night

With CIP on heat pumps, the boiler can be turned down or off outside processing hours.

Lower energy cost

Each kWh of electricity delivers about 2.6 kWh of heat at the required temperature, against well under one kWh of useful heat per kWh of fuel burnt.

No flame on site

No burner, flue or fuel tank for this duty, and no fuel deliveries to schedule.

Built-in redundancy

Several machines share the load. If one is serviced, the others and the storage carry most of the day, with the existing heater in reserve.

07Engineering pointers

Site data to collect

  • Number of CIP circuits and cycles per day
  • Volumes and set temperatures for lye, acid and rinse
  • Recovery tank sizes and return temperatures
  • Tanker CIP count per day
  • Existing steam heater duty on the CIP station
  • Present fuel or electricity use and monthly bill
  • Sanctioned electrical load and spare capacity
  • Space for the heat pumps and storage, with service access
  • Winter minimum ambient at site

Design notes

  • Exchanger materials. Use SS316 plates and EPDM gaskets rated for hot caustic. Nitric acid duty needs gaskets compatible with oxidising acids.
  • Recovery matters. Measure actual return temperatures and tank losses. Poorly insulated recovery tanks can double the reheat duty.
  • Logging. Record CIP temperature at the return line, not only at the supply, for food-safety audits.
  • Electrical. About 46 kW of heat pump input at rated conditions, plus pumps and fans. Check spare sanctioned load before ordering.
  • Winter output. The SE-SHT cascade gives about 80% of rated output at 7 °C ambient and still runs at −20 °C. Size on the coldest design day for northern sites.
  • Water quality. Scale forms quickly above 60 °C. Use softened make-up and keep the heat pump loop closed, with process fluids on the far side of an exchanger or coil.

Service and warranty

Sunniva has supplied 5,000+ heat pumps since 2012, with nine service technicians across India, including remote sites such as Leh. All components carry a one-year warranty.

Talk to us