Chat with Sunniva on WhatsApp
Skip to Content
Technical Data Sheet · Monoblock Heat Pump
SE-AH Series

SE-AH-14U

Inverter air source heat pump for sanitary hot water, with cooling. R410A circuit, single phase 220–240 V, one fan.

Sunniva SE-AH-14U heat pump unit
Heating capacity
14kW
At A7 °C / W45 °C
Heating COP
3.19
At A7 °C / W45 °C
Cooling capacity
7kW
At A35 °C / W7 °C · COP 2.08
Hot water output
315LPH
At A7 °C / W45 °C

Performance

Rated output at each published test condition
Heating A7 °C / W45 °C
Heating capacity
14.0kW
Power input
4.38kW
COP
3.19
Hot water output
315LPH
Cooling A35 °C / W7 °C
Cooling capacity
7.0kW
Power input
3.36kW
COP
2.08
Cold water output
220LPH

Technical specifications

SE-AH-14U
Technical specifications for SE-AH-14U
ParameterUnitSpecification
Electrical supply
Power supply—220~240 V / 50 Hz / 1 Ph
Maximum input powerkW4.20
Maximum currentA21.0
Refrigeration circuit
Compressor—Inverter
Number of compressorsNos1
Refrigerant—R410A
Refrigerant chargekg1.2
Heat exchanger (condenser)—Tube-in-shell / Brazed plate heat exchanger
Evaporator—Blue finned evaporator coil
Throttling device—Electronic expansion valve
Fan quantityNos1
Discharge / suction maximum pressureMPa4.5 / 1.5
Water circuit
Rated water flowm³/hr2.4
Water side rated pressureMPa0.3
Water resistancekPa75
Inlet / outlet pipe connector—DN25
Unit & acoustics
Dimensions (L × W × H)mm1030 × 400 × 800
Net weightkg90
Noise at 1 metredB(A)≤ 59
Ingress protection—IPX4
Electric-shock protection—Class I

Test conditions

  • T1 — Ambient 20/15 °C (DB/WB), E.T. 10 °C, C.T. 55 °C
  • T3 — Ambient 10/7 °C (DB/WB), E.T. 0 °C, C.T. 55 °C

Installation requirement

  • Single-phase 220–240 V supply on a dedicated circuit. MCB rating and cable size: confirm with Sunniva before wiring.
  • Maintain water flow of 2.4 m³/hr through the unit.

Built to order

Options available on this model

Options

  • Water connection — Coupling type to suit the site — threaded, flanged or grooved.
  • Casing — Stainless steel or powder-coated finish.
  • Circulation pump — Can be built into the unit instead of being fitted in the plant room.
  • Condenser — Stainless steel or copper, in place of the standard build.

How to order them

  • None of the above is the standard build, and none of it is included in the specification table on this page.
  • Ask for it at enquiry and have it confirmed in writing on the order acknowledgement. Price, lead time and weight can all change with it.

The table above describes the standard machine. Options are quoted per order and are available across the range except on the All-in-One and Split units.

Site installation schematic

How the unit connects to the tank, pumps and piping on site
≥600 mm ≥1000 mm clear at fan outlet HEAT PUMP SE-AH-14U STORAGE TANK 800 – 2400 L · insulated Single phase · MCB per Sunniva RCC pad, 200 mm larger each side RCC plinth 1180 × 550 × 150 TO TANK TOP HOT WATER TO USAGE POINTS RECIRCULATION RETURN COLD WATER FEED RETURN TO HEAT PUMP to drain drain Tank sensor → controller 1234 5678 9101112 13141516
Hot waterReturn to heat pumpCold water feedRecirculation returnElectrical & control
  1. 1Heat pump unit
  2. 2RCC foundation with anti-vibration pads
  3. 3Insulated storage tank
  4. 4Primary circulation pump
  5. 5Y-strainer
  6. 6Non-return valve
  7. 7Isolation valve (typical)
  8. 8Automatic air vent
  9. 9Safety / pressure-relief valve
  10. 10Tank sensor to heat pump controller
  11. 11Drain valve
  12. 12Cold water feed
  13. 13Hot water to usage points
  14. 14Recirculation (return-line) pump
  15. 15Thermometer
  16. 16Power supply / MCB panel

Indicative hookup only. Static head, draw pattern and local code may call for additional components — confirm the final scheme with Sunniva before ordering.

Selection & site preparation

Recommended sizing derived from this model’s rated data
System sizing
Storage tank volume800 – 2400 L
Tank sizing ruleHot water output × 2 to 6 LPH measured at 20 °C ambient. Indicative range — stay inside it so the tank is neither undersized nor oversized.
Primary circulation pump2.6 m³/hr @ 10 – 12 m head
Recirculation (return) pump0.3 – 0.4 m³/hr @ 6 – 8 m head
Primary pipe size25 mm (R1) to 10 m run; 32 mm beyond
Line insulation25 mm closed-cell, every line above 45 °C
Civil & electrical
Unit footprint & dry weight1030 × 400 mm · 70 kg
Heat pump plinth1180 × 550 × 150 mm RCC, M20
Plinth level100 mm above finished floor, ± 3 mm/m
Tank pad (800 L)150 mm RCC, 200 mm larger each side ≈ 920 kg filled
Clearances600 mm air-on · 1000 mm clear at the fan outlet · 600 mm service side
ElectricalSingle phase 220–240 V. MCB and cable: confirm with Sunniva

Installation steps

Follow in order — a commissioning engineer should sign off before start-up
  1. Cast the RCC plinth 1180 × 550 × 150 mm in M20 concrete, 100 mm above finished floor. Let it cure and check it is level within 3 mm per metre.
  2. Set the unit down on anti-vibration pads. Keep 600 mm clear at the finned coil face and 1000 mm clear at the fan outlet — the unit must breathe or capacity drops.
  3. Place the tank on its own level pad, as close to the heat pump as the site allows. Short pipes lose less heat.
  4. Pipe tank bottom → isolation valve → Y-strainer → primary pump → heat pump inlet, in that order. Fit the non-return valve after the pump.
  5. Pipe the heat pump outlet → tank top inlet. Fit an isolation valve at each end so the unit can be serviced without draining the tank.
  6. Fit the automatic air vent and the safety valve on the tank top. Pipe the safety valve discharge to an open drain — never cap it.
  7. Bring the cold water feed into the tank bottom through an isolation valve and a non-return valve.
  8. Fit the tank sensor into the tank pocket and run its cable back to the heat pump controller. Do not run it alongside the power cable.
  9. Insulate every hot line with 25 mm closed-cell insulation, pump body included.
  10. Power the unit from a dedicated single-phase circuit. Confirm the MCB and cable size with Sunniva before wiring.
  11. Fill and vent the system fully. Confirm the flow switch stops the unit when the pump is off, then start.

Process & instrumentation diagram

Refrigeration circuit, instrumentation and water connections
PILP PSLOW TT02 PSHIGH TT01 PIHP TT03 FS01 TT04 EVAPORATOR Blue finned coil FAN × 1 COMPRESSOR Scroll · hermetic CONDENSER Tube-in-shell / brazed plate Filter drier Sight glass TXV / EEV Y-strainer Sensing bulb AIR ON AIR OFF WATER OUT WATER IN SUCTION VAPOUR DISCHARGE · HOT GAS LIQUID LINE · R410A
Discharge / hot gasLiquid lineSuction vapourWater circuitAir flowTTTemperature transmitterPSPressure switch (HP / LP)PIPressure indicatorFSWater flow switch

Instrument schedule

Tags as marked on the diagram above
TagDeviceFunction
TT 01Compressor discharge temperatureDischarge superheat & high-temperature cut-out
TT 02Compressor suction temperatureSuction superheat monitoring
TT 03Water outlet temperatureSet-point control
TT 04Water inlet temperatureReturn water sensing, ΔT calculation
PS HIGHHigh-pressure switchDischarge over-pressure cut-out
TagDeviceFunction
PS LOWLow-pressure switchLoss-of-charge / low-suction cut-out
PI HPHigh-side pressure gaugeDischarge pressure indication
PI LPLow-side pressure gaugeSuction pressure indication
FS 01Water flow switchInterlock — no-flow lockout

Operating envelope

The compressor’s permitted window, in refrigeration terms
Operating envelope · R410A circuit Condensing against evaporating temperature — the compressor’s permitted operating window
67 °C max condensing 102030405060708090 −30−20−100102030 Tc °C CONDENSING Te °C EVAPORATING Normal operation
Envelope limits
Evaporating temperature Te−25 °C to 25 °C
Condensing temperature Tc20 °C to 67 °C
Peak condensing67 °C highest hot-water temperature the circuit can reach
Transient operationNot applicable the envelope above is the continuous operating window

Reading the envelope

  • Te (evaporating) follows the source the unit draws heat from — the colder the air or source water, the lower Te sits.
  • Tc (condensing) follows the water leaving the unit — asking for 80 °C hot water puts Tc near the top of the envelope.
  • A duty is valid only inside the shaded area. A cold source combined with very hot water pushes the point towards the top-left, which is exactly where the envelope closes in — that corner is the real limit on winter performance.

Representative envelope for the R410A circuit, redrawn from Panasonic compressor data (Operating envelop.xlsx, sheet “R410a”). Envelope limits are broadly similar across compressor makes, so treat this as a representation of the circuit’s operating window. Where a duty sits close to a boundary, confirm against the compressor fitted to the unit before finalising the design.

Documents & links

Scan with a phone camera, or tap the buttons

Talk to Sunniva

Scan to open a WhatsApp chat

Documentation

Scan to open the latest revision on sunnivaencon.com

Connect & review

Product videos and customer feedback

SE-AH-14U · Technical Data Sheet. Specifications are subject to change without prior notice.