Chat with Sunniva on WhatsApp
Skip to Content
Sunniva Encon LLP · Application NoteAN-029 · Rev 0 · 23 Oct 2026
Beverages and brewing

Mashing and wort heating from heat pumps

How a brewery making four 60 hL brews a day can supply its 50–78 °C mash and liquor heating with heat pumps, and what it saves against a furnace-oil boiler.

Application#29 Mashing and wort heating
Temperature band50–78 °C
Sunniva selection4 × SE-SHT-16C
Replacesfurnace-oil fired steam boiler

▶Video: Process hot water for food, dairy and beverages

V02 · 2–2.5 min
Process hot water for food, dairy and beverages

Pasteurisers, CIP, cooking and washing on stored hot water instead of boiler steam

Video coming soon

01Problem statement

  • Steam for gentle steps. Mash rests at 50, 63, 72 and 78 °C need a slow, even rise. Steam jackets at 150 °C or more scorch mash on the wall and make the rise hard to control.
  • Liquor shortfall. The wort cooler gives back hot liquor, but not always enough at the right temperature. The boiler makes up the difference with live steam.
  • Boiler cycling. Brewhouse demand comes in sharp peaks at mash-in and step rises. The boiler cycles heavily between peaks and loses heat each time.
  • Losses between fuel and process. Burning furnace oil in a boiler or heater and distributing the heat loses a quarter or more of the fuel's energy before it reaches the process.
  • Compliance, safety and handling. Fired equipment brings boiler inspections, fuel storage and unloading, flue emissions and an attendant on every shift.

02Use case

The reference brewery brews four 60 hL batches a day of lager and wheat beer over two shifts. It uses step infusion mashing in a jacketed mash tun, a lauter tun and a hot liquor tank topped up from the wort cooler.

Heat userProcess temp.BasisHeat, kWh/day
Mash step heating50 → 78 °C4 mashes × 4,000 L, cp 3.6, ρ 1.1, 10% losses542
Brewing liquor top-up80 °C8,000 L/day, 45 → 80 °C after wort-cooler recovery325
First wort preheating72 → 78 °C4 × 6,000 L, cp 4.0, ρ 1.04166
Storage and pipework standing losses–about 5%52
Total useful heat1,085

Averaged over 18 running hours, the heat pumps need about 60 kW.

03P&ID

L-101 · Hot primary · 90 °CTT103L-102 · Return · ~68 °CY-STRP-101AP-101Bduty / standbyEXP-101FS101HP-101SE-SHT-16C · 16 kWHP-102…104SE-SHT-16C · 16 kWAir-source, outdoorTK-1012,000 L90 °CinsulatedventTT101TT102LT101softenermake-up waterVFDP-102A/BL-201 · Supply header · 88 °CTCV-201TIC201TK-201Mash tun jacket78 °Cmash in 50 °Cmash out 78 °CTCV-202TIC202TK-202Hot liquor tank80 °CTCV-203TIC203PHE-203Wort preheater78 °CL-202 · Return header · ~68 °CNCB-001 existing FO boilerstandby / top-up onlyhot supplyreturnsignalpumpvalvenormally closedINDICATIVE P&ID · NOT FOR CONSTRUCTIONAN-029 · Rev 0 · Sunniva Encon LLP

Tags: HP heat pump, TK tank, SG steam generator, P pump, PHE plate heat exchanger, TCV temperature control valve, TIC temperature indicating controller (panel), TT temperature transmitter, MT moisture transmitter, PT pressure transmitter, LT level transmitter, FS flow switch, NC normally closed. Process fluids are heated through their own exchanger, coil or jacket.

04Solution

System description

  • 4 × SE-SHT-16C (64 kW total) (SE-SHT cascade heat pump) delivering 90 °C, covering the day's 1,085 kWh in about 17.0 running hours.
  • A 2,000 L insulated storage tank decouples the heat pumps from the process peaks.
  • The furnace-oil fired steam boiler stays connected behind a normally closed valve as standby.
  • The mash tun jacket is fed with 90 °C hot water instead of steam, giving a controlled rise of about 1 K per minute without scorching.
  • The heat pumps top up the hot liquor tank to 80 °C after the wort cooler has done its share.
  • Storage covers the mash-in peak, so the heat pumps run steadily through both shifts.

Selected equipment

ModelSE-SHT-16C × 4
Heating capacity16 kW each, 64 kW total
COP2.7 at A20 °C / W90 °C (data sheet T1)
Power inputabout 23.8 kW total at rated conditions
Ratingcascade R410A + R515B, rated 90 °C, 95 °C maximum
Supply temperature90 °C
Storage2,000 L insulated tank

Ratings from the Sunniva TDS 2026 data sheets.

Control philosophy

TT-101 at the tank top calls the heat pumps on below 85 °C and off at 90 °C. TT-102 at the bottom starts a unit early before each mash-in. TIC-201 follows the mash rest programme, TIC-202 holds the hot liquor tank at 80 °C and TIC-203 sets the wort outlet temperature. The boiler stays as standby.

05Energy saving and ROI

Change any input to match a customer's site. Defaults are typical Indian prices for October 2026. The installed cost is a placeholder; replace it with the actual quotation.

Plant
Existing heating
Heat pump
Annual saving–energy + O&M
Simple payback––
Purchased energy––
10-year net gain–after paying for the system
ExistingHeat pump
Daily consumption––
Annual energy cost––
Cost per 1,000 L wort––
CO₂ per year––
Cumulative cash position, years 0–10

06Benefits

No scorching

A 90 °C jacket cannot burn mash onto the wall the way steam can, so cleaning is easier and flavour is cleaner.

Repeatable rests

Rest temperatures are held within a fraction of a degree, which keeps attenuation and body consistent.

Liquor always ready

The hot liquor tank stays at temperature between brews without live steam.

Lower energy cost

Each kWh of electricity delivers about 2.7 kWh of heat at the required temperature, against well under one kWh of useful heat per kWh of fuel burnt.

No flame on site

No burner, flue or fuel tank for this duty, and no fuel deliveries to schedule.

Built-in redundancy

Several machines share the load. If one is serviced, the others and the storage carry most of the day, with the existing heater in reserve.

07Engineering pointers

Site data to collect

  • Brews per day and batch size
  • Mash programme and jacket area
  • Wort cooler hot liquor volume and temperature
  • Hot liquor tank size
  • Present fuel use per brew
  • Present fuel or electricity use and monthly bill
  • Sanctioned electrical load and spare capacity
  • Space for the heat pumps and storage, with service access
  • Winter minimum ambient at site

Design notes

  • Jacket area. Steam jackets are sized for a large temperature difference. Check the jacket area is enough with 90 °C water, or add a wort PHE loop.
  • Liquor treatment. Brewing liquor is heated through a coil or exchanger, so its mineral treatment is unchanged.
  • Electrical. About 24 kW of heat pump input at rated conditions, plus pumps and fans. Check spare sanctioned load before ordering.
  • Winter output. The SE-SHT cascade gives about 80% of rated output at 7 °C ambient and still runs at −20 °C. Size on the coldest design day for northern sites.
  • Water quality. Scale forms quickly above 60 °C. Use softened make-up and keep the heat pump loop closed, with process fluids on the far side of an exchanger or coil.

Service and warranty

Sunniva has supplied 5,000+ heat pumps since 2012, with nine service technicians across India, including remote sites such as Leh. All components carry a one-year warranty.

Talk to us

sales@sunnivaencon.com+91 93213 65103www.sunnivaencon.com