Sunniva Encon LLP · Application NoteAN-007 · Rev 0 · 23 Oct 2026
Dairy and food processing

Evaporator steam made from evaporator waste heat

How a triple-effect falling-film evaporator removing 5,000 kg of water a day can take its first-effect steam from a heat pump fed by its own condensate, instead of a furnace-oil boiler.

Application#7 Falling-film evaporators (milk, juice, tomato paste)
Temperature band90–110 °C
Sunniva selection5 × SE-WWUHT-27
Replacesfurnace-oil fired steam boiler

▶Video: Low-pressure steam from waste heat

V07 · 2–2.5 min
Low-pressure steam from waste heat

Water-source R245fa heat pumps making 2 bar steam up to 120 °C

Video coming soon

01Problem statement

  • Steam in, warm water out. The evaporator takes in steam at the first effect and rejects nearly the same heat as warm condensate and condenser water.
  • Cooling tower load. The last-effect vapour condenser loads the cooling tower, and vacuum suffers on hot days.
  • Feed preheat also on steam. Bringing feed to 95 °C adds a second steam user that runs for the whole campaign.
  • Losses between fuel and process. Burning furnace oil in a boiler or heater and distributing the heat loses a quarter or more of the fuel's energy before it reaches the process.
  • Compliance, safety and handling. Fired equipment brings boiler inspections, fuel storage and unloading, flue emissions and an attendant on every shift.

02Use case

The reference plant runs a triple-effect falling-film evaporator for milk concentrate, with campaigns of fruit juice and tomato paste. It evaporates about 500 kg of water an hour over a 10-hour run, followed by CIP. Feed is preheated to about 95 °C before the first effect.

Heat userProcess temp.BasisHeat, kWh/day
First-effect steamSteam 2 bar, ~120 °C5,000 kg/day water removed ÷ economy 2.6 = 1,920 kg steam × 0.62 kWh/kg1,190
Feed preheating60 → 95 °C6,900 L/day feed at 12.5% solids272
Storage and pipework standing losses–about 5%73
Total useful heat1,535

Averaged over 12 running hours, the heat pumps need about 128 kW.

03P&ID

L-101 · Hot primary · 120 °CTT103L-102 · Return · ~90 °CY-STRP-101AP-101Bduty / standbyEXP-101FS101HP-101…105SE-WWUHT-27 · 27 kWP-100SRC-100evaporator condensateand vapour-condenserwaterheat source ~55 °CWater-sourceSG-101flash steamgenerator2 bar gsafety valvePT101TT102LT101softenerfeedwater make-upL-201 · Steam header · 2 bar gTCV-201TIC201STM-2011st-effect calandria~120 °C steamfeed in 95 °Cto 2nd effectTCV-202TIC202PHE-202Feed preheater95 °CP-201 condensateL-202 · Condensate returnNCB-001 existing FO boilerstandby / top-up onlysteam / hot supplyreturnsignalsource waterpumpvalvenormally closedINDICATIVE P&ID · NOT FOR CONSTRUCTIONAN-007 · Rev 0 · Sunniva Encon LLP

Tags: HP heat pump, TK tank, SG steam generator, P pump, PHE plate heat exchanger, TCV temperature control valve, TIC temperature indicating controller (panel), TT temperature transmitter, MT moisture transmitter, PT pressure transmitter, LT level transmitter, FS flow switch, NC normally closed. Process fluids are heated through their own exchanger, coil or jacket.

04Solution

System description

  • 5 × SE-WWUHT-27 (135 kW total) (SE-WWUHT water-source, R245fa) delivering 120 °C, covering the day's 1,535 kWh in about 11.4 running hours.
  • Heat source: evaporator condensate and vapour-condenser water at about 55 °C. Cooling the vapour-condenser water reduces cooling tower load and improves last-effect vacuum.
  • The furnace-oil fired steam boiler stays connected behind a normally closed valve as standby.
  • Condensate from the calandrias and water from the vapour condenser are collected at about 55 °C and fed to the water-source heat pump.
  • The heat pump makes 2 bar steam for the first-effect calandria, taking over from the boiler during the run.
  • The feed preheater is moved to the same steam header.
  • For new or larger lines, mechanical vapour recompression (MVR) is the natural next step and can be studied separately.

Selected equipment

ModelSE-WWUHT-27 × 5
Heating capacity27 kW each, 135 kW total
COP2.93 at the data sheet's rated condition (60/55 °C source water)
Power inputabout 46.0 kW total at rated conditions
Ratingwater or steam to 120 °C, R245fa
Supply temperature120 °C
Steam40 kg/h at 2 bar per SE-WWUHT-27 module

Ratings from the Sunniva TDS 2026 data sheets.

Control philosophy

PT-101 on the low-pressure steam header controls heat pump capacity to hold 2 bar. TIC-201 holds the first-effect temperature through the existing steam valve. TIC-202 holds feed at 95 °C. If header pressure falls below 1.6 bar, the boiler steam valve opens as standby.

05Energy saving and ROI

Change any input to match a customer's site. Defaults are typical Indian prices for October 2026. The installed cost is a placeholder; replace it with the actual quotation.

Plant
Existing heating
Heat pump
Annual saving–energy + O&M
Simple payback––
Purchased energy––
10-year net gain–after paying for the system
ExistingHeat pump
Daily consumption––
Annual energy cost––
Cost per 1,000 L feed––
CO₂ per year––
Cumulative cash position, years 0–10

06Benefits

Evaporator feeds itself

Heat leaving in condensate and condenser water is returned to the first effect.

Better vacuum

Cooling the vapour-condenser water helps the last effect hold vacuum on hot afternoons.

Smaller boiler duty

The boiler is needed only for start-up and standby during the run.

Lower energy cost

Each kWh of electricity delivers about 2.9 kWh of heat at the required temperature, against well under one kWh of useful heat per kWh of fuel burnt.

No flame on site

No burner, flue or fuel tank for this duty, and no fuel deliveries to schedule.

Built-in redundancy

Several machines share the load. If one is serviced, the others and the storage carry most of the day, with the existing heater in reserve.

07Engineering pointers

Site data to collect

  • Evaporation rate and number of effects
  • Steam consumption and pressure at the first effect
  • Condensate and condenser water flows and temperatures
  • Feed rate, solids in and out
  • Campaign and CIP hours
  • Present fuel or electricity use and monthly bill
  • Sanctioned electrical load and spare capacity
  • Space for the heat pumps and storage, with service access

Design notes

  • Condensate quality. Vapour condensate can carry product traces. Use it only as a heat source through an exchanger, never as boiler feed without checks.
  • Steam pressure. Confirm the first-effect calandria works at 2 bar supply. Most falling-film first effects run well below this.
  • Start-up. Use boiler steam to bring the evaporator to temperature until enough condensate is available as a source.
  • Electrical. About 46 kW of heat pump input at rated conditions, plus pumps and fans. Check spare sanctioned load before ordering.
  • Source stream. The source must give up roughly two-thirds of the heat delivered. Confirm its flow and temperature over a full production day, and filter it before the evaporator.
  • Water quality. Scale forms quickly above 60 °C. Use softened make-up and keep the heat pump loop closed, with process fluids on the far side of an exchanger or coil.

Service and warranty

Sunniva has supplied 5,000+ heat pumps since 2012, with nine service technicians across India, including remote sites such as Leh. All components carry a one-year warranty.