Sunniva Encon LLP · Application NoteAN-034 · Rev 0 · 23 Oct 2026
Beverages and brewing

Column reboiler steam from overhead condenser heat

How a 2 KLPD rectification unit can raise reboiler steam from its own overhead condenser water, and what it saves against a briquette-fired boiler.

Application#34 Ethanol distillation column reboilers
Temperature band90–110 °C
Sunniva selection5 × SE-WWUHT-27
Replacesbriquette-fired steam boiler

▶Video: Low-pressure steam from waste heat

V07 · 2–2.5 min
Low-pressure steam from waste heat

Water-source R245fa heat pumps making 2 bar steam up to 120 °C

Video coming soon

01Problem statement

  • Heat in at the bottom, out at the top. Almost all the reboiler steam leaves the column again in the overhead condenser at around 78 °C, and goes to the cooling tower.
  • Boiler steam far hotter than needed. Column bottoms boil at 95–105 °C, but the boiler makes steam at 150 °C or more.
  • Biomass supply and ash. Briquette quality and price vary by season, and the boiler needs ash handling and an attendant around the clock.
  • Losses between fuel and process. Burning briquettes in a boiler or heater and distributing the heat loses a quarter or more of the fuel's energy before it reaches the process.
  • Compliance, safety and handling. Fired equipment brings boiler inspections, fuel storage and unloading, flue emissions and an attendant on every shift.

02Use case

The reference unit redistils purchased rectified spirit into 2,000 litres a day of extra neutral alcohol, running round the clock. It has a rectifier column and an aldehyde column, each with a steam reboiler and a water-cooled overhead condenser.

Heat userProcess temp.BasisHeat, kWh/day
Rectifier column reboilerBottoms 102–105 °C2,000 L/day ENA × 1.4 kg steam/L × 0.63 kWh/kg1,764
Aldehyde column reboilerBottoms 95 °C2,000 L/day × 0.4 kg steam/L × 0.63 kWh/kg504
Storage and pipework standing losses–about 5%113
Total useful heat2,381

Averaged over 20 running hours, the heat pumps need about 119 kW.

03P&ID

L-101 · Hot primary · 120 °CTT103L-102 · Return · ~90 °CY-STRP-101AP-101Bduty / standbyEXP-101FS101HP-101…105SE-WWUHT-27 · 27 kWP-100SRC-100column overheadcondenser waterheat source ~58 °CWater-sourceSG-101flash steamgenerator2 bar gsafety valvePT101TT102LT101softenerfeedwater make-upL-201 · Steam header · 2 bar gTCV-201TIC201ST-201Rectifier reboiler103 °C bottomsbottoms 100 °Cvapour 103 °CTCV-202TIC202ST-202Aldehyde col reboiler95 °C bottomsP-201 condensateL-202 · Condensate returnNCB-001 existing briquette boilerstandby / top-up onlysteam / hot supplyreturnsignalsource waterpumpvalvenormally closedINDICATIVE P&ID · NOT FOR CONSTRUCTIONAN-034 · Rev 0 · Sunniva Encon LLP

Tags: HP heat pump, TK tank, SG steam generator, P pump, PHE plate heat exchanger, TCV temperature control valve, TIC temperature indicating controller (panel), TT temperature transmitter, MT moisture transmitter, PT pressure transmitter, LT level transmitter, FS flow switch, NC normally closed. Process fluids are heated through their own exchanger, coil or jacket.

04Solution

System description

  • 5 × SE-WWUHT-27 (135 kW total) (SE-WWUHT water-source, R245fa) delivering 120 °C, covering the day's 2,381 kWh in about 17.6 running hours.
  • Heat source: column overhead condenser water at about 58 °C. Heat taken from the overhead condenser water cuts the cooling tower duty by the same amount.
  • The briquette-fired steam boiler stays connected behind a normally closed valve as standby.
  • The overhead condensers are run warmer, returning water at about 58 °C, which becomes the heat pump source.
  • The heat pumps make 2 bar steam at about 120 °C and feed it to both reboilers through the existing steam header.
  • Column heat that used to leave through the cooling tower is returned to the reboilers.

Selected equipment

ModelSE-WWUHT-27 × 5
Heating capacity27 kW each, 135 kW total
COP2.93 at the data sheet's rated condition (60/55 °C source water)
Power inputabout 46.0 kW total at rated conditions
Ratingwater or steam to 120 °C, R245fa
Supply temperature120 °C
Steam40 kg/h at 2 bar per SE-WWUHT-27 module

Ratings from the Sunniva TDS 2026 data sheets.

Control philosophy

PT-101 on the steam header calls the heat pumps on below 1.8 bar and unloads them at 2.0 bar. TT-102 on the condenser water return stops a unit if the source falls below 50 °C. TIC-201 and TIC-202 keep column bottoms temperatures through the reboiler steam valves. The boiler stays on the header as standby and for start-up.

05Energy saving and ROI

Change any input to match a customer's site. Defaults are typical Indian prices for October 2026. The installed cost is a placeholder; replace it with the actual quotation.

Plant
Existing heating
Heat pump
Annual saving–energy + O&M
Simple payback––
Purchased energy––
10-year net gain–after paying for the system
ExistingHeat pump
Daily consumption––
Annual energy cost––
Cost per 1,000 L ENA––
CO₂ per year––
Cumulative cash position, years 0–10

06Benefits

Column heat recycled

Heat rejected at the top of the column is lifted and fed back to the bottom.

Smaller cooling tower duty

The overhead condensers send less heat to the cooling tower.

Stable column operation

Steady steam pressure from the heat pumps helps hold column profiles and product purity.

Lower energy cost

Each kWh of electricity delivers about 2.9 kWh of heat at the required temperature, against well under one kWh of useful heat per kWh of fuel burnt.

No flame on site

No burner, flue or fuel tank for this duty, and no fuel deliveries to schedule.

Built-in redundancy

Several machines share the load. If one is serviced, the others and the storage carry most of the day, with the existing heater in reserve.

07Engineering pointers

Site data to collect

  • Spirit throughput and steam per litre for each column
  • Reboiler type, area and design steam pressure
  • Overhead condenser area and cooling water flow
  • Area classification drawing of the distillation house
  • Present fuel or electricity use and monthly bill
  • Sanctioned electrical load and spare capacity
  • Space for the heat pumps and storage, with service access

Design notes

  • Reboiler area. 2 bar steam gives a smaller temperature difference in the reboiler. Check the reboiler area, or consider running the column under slight vacuum.
  • Condenser temperature. Running the overhead condenser warmer needs enough condenser area to keep reflux and vent losses in limits. Check vent condenser performance.
  • Flammable area. Locate the heat pumps outside the classified area of the distillation house and connect through water and steam lines only.
  • Electrical. About 46 kW of heat pump input at rated conditions, plus pumps and fans. Check spare sanctioned load before ordering.
  • Source stream. The source must give up roughly two-thirds of the heat delivered. Confirm its flow and temperature over a full production day, and filter it before the evaporator.
  • Water quality. Scale forms quickly above 60 °C. Use softened make-up and keep the heat pump loop closed, with process fluids on the far side of an exchanger or coil.

Service and warranty

Sunniva has supplied 5,000+ heat pumps since 2012, with nine service technicians across India, including remote sites such as Leh. All components carry a one-year warranty.